Dormers, hip-to-gable and Velux conversions taken from the first steel to the last coat of paint — structure, roofing, insulation, staircase and finish, all by one team.
A loft conversion is the one job where every trade has to arrive in the right order. Steels go in before the floor, the floor before the framing, the roof watertight before anything inside it, and the staircase has to be designed around head height you cannot change later. Get the sequence wrong and the fixes are expensive.
A free visit to see the job properly. No call-out charge.
An itemised price, agreed before anything starts.
Same faces on site, dust sheets down, tidied daily.
We walk it through with you and put right anything you flag.
Common Questions
Many rear dormer and Velux conversions fall under permitted development, but hip-to-gable and front dormers frequently do not, and flats, listed buildings and conservation areas are excluded from permitted development altogether. Building regulations approval is required either way. We establish which applies to your property before quoting.
A straightforward rear dormer usually runs eight to twelve weeks from scaffold to completion. Hip-to-gable and L-shaped conversions take longer. Weather, structural surprises and building control inspection dates all move the finish date, and we give you a realistic programme rather than an optimistic one.
As a rule of thumb you want around 2.2 to 2.4 metres from the existing ceiling joists to the ridge before conversion. Less than that and the options narrow to lowering ceilings below or raising the roof, both of which change the cost significantly. We measure it on the first visit and tell you straight away.